
Demolition in Roseville, CA
Residential and commercial demolition, pool removal, concrete removal and hauling in Roseville. Licensed & insured, CA #1141839.
Demolition in Roseville
Next Demolition handles demolition, pool removal, concrete removal and hauling all over Roseville. Every job starts with a free on-site quote, and we haul the debris away and leave the site clean.
Residential demolition in Roseville
We take down houses, detached garages, sheds and additions, and we do interior strip-outs down to the studs. Slab and foundation removal can be part of the job. Gas, water and electric have to be shut off by the utility before we start.
Commercial demolition in Roseville
Interior strip-outs for tenant improvements, selective demolition that protects the rest of the building, and full building removal. We plan around your schedule to keep downtime short.
Pool removal in Roseville
We remove inground and above-ground pools in Roseville. An average pool removal takes about 5 business days from the first break-out to the final grade. We pull the pool demolition permit for you and schedule the inspections.
For most backyards we recommend partial removal. It's the most affordable option and works well for lawn, garden or landscaping. If you plan to build where the pool was, choose full removal.
Concrete removal in Roseville
Driveways, patios, walkways, slabs and foundations. We saw-cut where needed so the concrete you keep has a clean edge, and the broken concrete is hauled off and recycled.
Hauling and site clearing in Roseville
Demolition debris, concrete, dirt, brush and old structures, loaded and hauled in one visit whenever possible.
What we take down in Roseville
Residential DemolitionHouses, garages, additions and interior gut-outs.Learn more
Commercial DemolitionBuildings, tenant improvements and interior strip-outs.Learn more
Pool DemolitionFull or partial pool removal, hauled away.Learn more
Concrete DemolitionDriveways, slabs, patios, cutting and breaking.Learn more
Hauling ServicesDemolition debris hauled off and the site cleaned up.Learn moreReal jobs, before and after.
Drag the slider to see the difference. Pick a job to switch photos.






What customers say
Questions from Roseville customers
How long does pool removal take in Roseville?
About 5 business days on average, from break-out to final grade. Your quote includes the timeline.
Do you pull the permit?
For pool removal, yes. We apply with the city and schedule the inspections. For other jobs we'll talk through what's needed when we walk the site.
Partial or full pool removal?
For most backyards we recommend partial removal. It's the most affordable. Choose full removal if you plan to build there.
Do you haul everything away?
Yes. Debris is hauled off and recycled where possible, and the site is left clean.
Is the quote free?
Yes. We come out to your property in Roseville, look at the job and give you a written quote.

Got something that needs to come down?
Get your free quote in Roseville
Tell us what's coming down. Photos help us quote faster.
